Integrated Production Planning in the Age of Industry 4.0

  • type: Lecture / Practice (VÜ)
  • chair: KIT-Fakultäten - KIT-Fakultät für Maschinenbau - Institut für Produktionstechnik
    KIT-Fakultäten - KIT-Fakultät für Maschinenbau
  • semester: SS 2021
  • time: 2021-04-13
    14:00 - 15:30 weekly


    2021-04-15
    14:00 - 17:30 weekly

    2021-04-20
    14:00 - 15:30 weekly

    2021-04-22
    14:00 - 17:30 weekly

    2021-04-27
    14:00 - 15:30 weekly

    2021-04-29
    14:00 - 17:30 weekly

    2021-05-04
    14:00 - 15:30 weekly

    2021-05-06
    14:00 - 17:30 weekly

    2021-05-11
    14:00 - 15:30 weekly

    2021-05-18
    14:00 - 15:30 weekly

    2021-05-20
    14:00 - 17:30 weekly

    2021-06-01
    14:00 - 15:30 weekly

    2021-06-08
    14:00 - 15:30 weekly

    2021-06-10
    14:00 - 17:30 weekly

    2021-06-15
    14:00 - 15:30 weekly

    2021-06-17
    14:00 - 17:30 weekly

    2021-06-22
    14:00 - 15:30 weekly

    2021-06-24
    14:00 - 17:30 weekly

    2021-06-29
    14:00 - 15:30 weekly

    2021-07-01
    14:00 - 17:30 weekly

    2021-07-06
    14:00 - 15:30 weekly

    2021-07-08
    14:00 - 17:30 weekly

    2021-07-13
    14:00 - 15:30 weekly

    2021-07-15
    14:00 - 17:30 weekly

    2021-07-20
    14:00 - 15:30 weekly

    2021-07-22
    14:00 - 17:30 weekly


  • lecturer: Prof. Dr.-Ing. Gisela Lanza
  • sws: 6
  • lv-no.: 2150660
  • information: Online
Content

Integrated production planning in the age of industry 4.0 will be taught in the context of this engineering science lecture. In addition to a comprehensive introduction to Industry 4.0, the following topics will be addressed at the beginning of the lecture:

  • Basics, history and temporal development of production
  • Integrated production planning and integrated digital engineering
  • Principles of integrated production systems and further development with Industry 4.0

Building on this, the phases of integrated production planning are taught in accordance with VDI Guideline 5200, whereby special features of parts production and assembly are dealt with in the context of case studies:

  • Factory planning system
  • Definition of objectives
  • Data collection and analysis
  • Concept planning (structural development, structural dimensioning and rough layout)
  • Detailed planning (production planning and control, fine layout, IT systems in an industry 4.0 factory)
  • Preparation and monitoring of implementation
  • Start-up and series support

The lecture contents are rounded off by numerous current practical examples with a strong industry 4.0 reference. Within the exercises the lecture contents are deepened and applied to specific problems and tasks.

 

Learning Outcomes:

The students …

  • can discuss basic questions of production technology.
  • are able to apply the methods of integrated production planning they have learned about to new problems.
  • are able to analyze and evaluate the suitability of the methods, procedures and techniques they have learned about for a specific problem.
  • can apply the learned methods of integrated production planning to new problems.
  • can use their knowledge targeted for efficient production technology.

 

Workload:

MACH:
regular attendance: 63 hours
self-study: 177 hours
WING:
regular attendance: 63 hours
self-study: 207 hours

Language of instructionGerman
Bibliography

Medien:
Skript zur Veranstaltung wird über (https://ilias.studium.kit.edu/) bereitgestellt.

Media:
Lecture notes will be provided in Ilias (https://ilias.studium.kit.edu/).

Organisational issues

Vorlesungstermine dienstags 14.00 Uhr und donnerstags 14.00 Uhr, Übungstermine donnerstags 15.45 Uhr. Bekanntgabe der konkreten Übungstermine erfolgt in der ersten Vorlesung